Is it worth keeping my reservation?

MEDICALJMP

Well-known member
First Name
Jeff
Joined
Apr 28, 2020
Messages
687
Reaction score
1,148
Location
Omaha, NE
Vehicles
Toyota Avalon, Rav4, Tri-motor Cybertruck
Occupation
Nurse
Country flag
It took 1 year to build the Empire State Building, during the depression. 100 stories straight up. Steel beams riveted in place. Just a little tidbit to stir the pot.





Advertisement

 

Ehninger1212

Well-known member
First Name
Jake
Joined
Dec 18, 2019
Messages
777
Reaction score
1,331
Location
Houston, TX
Vehicles
Audi A3 E-Tron - 2005 Land Rover LR3 - T-Bucket - 1951 chevy 3100
Occupation
Architect/Fabricator
Country flag
It took 1 year to build the Empire State Building, during the depression. 100 stories straight up. Steel beams riveted in place. Just a little tidbit to stir the pot.
410 days start to finish, cheap exploited labor and 5 people killed. Hardly impressive.
 

egandalf

Well-known member
First Name
James
Joined
May 18, 2020
Messages
79
Reaction score
190
Location
41144
Vehicles
2010 Toyota Tacoma
Country flag
Edit: "First dry in" could mean pretty much any small section of the building, I doubt they mean all of the "Phase 1" building. That would be insane.

I think this is the major point. I know we're all eager for this to mean "Walls up on the CT factory!" but that's clearly not been stated.

Like everyone else, I'm very hopeful that the CT deliveries start next year. At the same time, I keep attempting (often failing) to temper that hope with the realism that this is a big job they're taking on and there's a good chance that deliveries won't happen.

My construction experience is limited to a few houses, but when I watch the pace in the videos, I'm amazed at the progress. I suspect deliveries will happen Q1 2022 at the latest.

FWIW, I didn't read any insult into your earlier post. ¯\_(ツ)_/¯
 

egandalf

Well-known member
First Name
James
Joined
May 18, 2020
Messages
79
Reaction score
190
Location
41144
Vehicles
2010 Toyota Tacoma
Country flag
Get something SUPER cheap to hold you over.
I completely agree with this. I currently drive a 2010 Toyota Tacoma with >100,000 miles. Runs like a champ and gets ~19mpg (Toyota trucks are notoriously inefficient, but run FOREVER). Wonderful vehicle for jaunts around town and the occasional weekend-warrior haul.

When I was researching selling mine in order to help pay for the CT, I found trucks like mine sell in my area for around $15k. Obviously, older or higher mileage = cheaper vehicle. A Toyota with 100k miles still has a lot of life left in it.
 

Ehninger1212

Well-known member
First Name
Jake
Joined
Dec 18, 2019
Messages
777
Reaction score
1,331
Location
Houston, TX
Vehicles
Audi A3 E-Tron - 2005 Land Rover LR3 - T-Bucket - 1951 chevy 3100
Occupation
Architect/Fabricator
Country flag
FWIW, I didn't read any insult into your earlier post. ¯\_(ツ)_/¯
Idk, apparently the person I was responding to did.
" So I have to shoot the insult back at you"
 

Jhodgesatmb

Well-known member
First Name
Jack
Joined
Dec 1, 2019
Messages
896
Reaction score
926
Location
San Francisco Bay area
Vehicles
Lexus Rx450H Tesla Model 3
Occupation
Researcher
Country flag
Well.. I can say I deal with construction and construction administration often. Overseeing the buildings I and my team design get constructed. I can tell you that the pace they are going at is more rapid than what many in the industry consider to be "quick". I have seen much smaller buildings be completed within 7-11 months and that is considered quick. we are talking 30-50 thousand square foot projects. Not nearly the same scale.

So yeah I don't have a "Metric" comparison to give you. Also not trying to throw around insults. We do work in the bay area, California in general, so I can promise EVERYTHING THERE IS SLOW HAHA. We have been starring at basically site work since they started. Which has been extensive and is usually pretty lackluster to look at.

Edit: "First dry in" could mean pretty much any small section of the building, I doubt they mean all of the "Phase 1" building. That would be insane.
I assumed that first dry in would be some small section of one building but it would have to be a functionally-significant size or they would be laughed at by the whole world. So walls and a roof on, say, 50,000 square feet? That would only amount to about 225 feet on a side and they are almost there in their current structure (5 sections at 40 feet per section), but it would require a full roof and walls, right? I am just saying that I cannot even see that happening this month. Anyway, we'll see what they have done in 30 days...

I am not in the construction trade, I just love watching all the stages of construction. I do believe that the terraforming at giga Austin has gone at a great pace. It has been the concrete work that got off to a slow start and is now doing well, and the steel work is very slow.
 

Ehninger1212

Well-known member
First Name
Jake
Joined
Dec 18, 2019
Messages
777
Reaction score
1,331
Location
Houston, TX
Vehicles
Audi A3 E-Tron - 2005 Land Rover LR3 - T-Bucket - 1951 chevy 3100
Occupation
Architect/Fabricator
Country flag
I assumed that first dry in would be some small section of one building but it would have to be a functionally-significant size or they would be laughed at by the whole world. So walls and a roof on, say, 50,000 square feet? That would only amount to about 225 feet on a side and they are almost there in their current structure (5 sections at 40 feet per section), but it would require a full roof and walls, right? I am just saying that I cannot even see that happening this month. Anyway, we'll see what they have done in 30 days...

I am not in the construction trade, I just love watching all the stages of construction. I do believe that the terraforming at giga Austin has gone at a great pace. It has been the concrete work that got off to a slow start and is now doing well, and the steel work is very slow.
I can see it happening, As long as they have no weather delays. Yes dry in just mean the space keeps the elements out. There is a large amount of work that goes after that.
 

VI Tesla

Well-known member
First Name
David
Joined
Nov 29, 2019
Messages
176
Reaction score
301
Location
Nanaimo
Vehicles
Model 3, Cybertruck
Country flag
Hi,

Question for anyone here that might be able give their opinion. My reservation number is, RN113530685 Dual Motor with FSD (reserved in June 2020). I know there is an insane number of orders and need to purchase a car in 2021. I’m willing to wait until late 2021 as long as I’m likely to get it in time.
I assume that with my reservation number my order I might not receive mine until 2022 sometime? Is it worth keeping my reservation with me needing to purchase a car in 2021?
FYI, Tesla's been reaching out to CT reservation owners to start a lease on another Telsa, maybe worth looking into? Perhaps you can swing some sort of deal?
 
Last edited:

Crissa

Well-known member
First Name
Crissa
Joined
Jul 8, 2020
Messages
3,037
Reaction score
3,205
Location
Santa Cruz
Vehicles
2014 Zero S, 2013 Mazda 3
Country flag
Also, building works semi-geometricly. You put in a few, train those guys. But then those guys can train those guys. So the first day you do one hole or beam, then two, then four, then eight... You aren't just putting that one-a-day thing. Any time there are repeating tasks, workers slowly get better at them, too. But they can also train other workers, managers don't have to focus on the micro bits and can move on.

So that steel we're seeing today is establishing a pattern. Like those tall columns in the south end. First there was one. Then two. Then eight. Boom.

-Crissa
 

Jhodgesatmb

Well-known member
First Name
Jack
Joined
Dec 1, 2019
Messages
896
Reaction score
926
Location
San Francisco Bay area
Vehicles
Lexus Rx450H Tesla Model 3
Occupation
Researcher
Country flag
Also, building works semi-geometricly. You put in a few, train those guys. But then those guys can train those guys. So the first day you do one hole or beam, then two, then four, then eight... You aren't just putting that one-a-day thing. Any time there are repeating tasks, workers slowly get better at them, too. But they can also train other workers, managers don't have to focus on the micro bits and can move on.

So that steel we're seeing today is establishing a pattern. Like those tall columns in the south end. First there was one. Then two. Then eight. Boom.

-Crissa
I would certainly buy into that idea if it weren’t for the fact that they have had some skeletal structure up for over a month. If they are training each other they suck at training. Getting 3 sections up was big because then they could work at both ends, but they had 3 sections up a couple weeks ago and are only just now starting to work both ends. Like I said before, I am hopeful but I am no longer confident.
 

BenH

Member
First Name
Ben
Joined
Sep 24, 2020
Messages
7
Reaction score
12
Location
NJ
Vehicles
Model 3
Occupation
IT
Country flag
Hi,

Question for anyone here that might be able give their opinion. My reservation number is, RN113530685 Dual Motor with FSD (reserved in June 2020). I know there is an insane number of orders and need to purchase a car in 2021. I’m willing to wait until late 2021 as long as I’m likely to get it in time.
I assume that with my reservation number my order I might not receive mine until 2022 sometime? Is it worth keeping my reservation with me needing to purchase a car in 2021?
If you not need your $100 deposit urgently, absolutely yes.
 

Mike Hickey

Member
First Name
Mike
Joined
Mar 4, 2020
Messages
10
Reaction score
6
Location
Port Townsend WA
Vehicles
Cybertruck 2 motor
Occupation
Retired
Country flag
Hi,

Question for anyone here that might be able give their opinion. My reservation number is, RN113530685 Dual Motor with FSD (reserved in June 2020). I know there is an insane number of orders and need to purchase a car in 2021. I’m willing to wait until late 2021 as long as I’m likely to get it in time.
I assume that with my reservation number my order I might not receive mine until 2022 sometime? Is it worth keeping my reservation with me needing to purchase a car in 2021?
Keep your reservation. You'll be able to resell your truck at a premium.
"Johnny come lately" will have to pay to play before 2025, when today's reservations will be fulfilled.
 

Riptide

Member
First Name
Roland
Joined
Jan 4, 2020
Messages
21
Reaction score
16
Location
Los Angeles
Vehicles
Jeeps
Country flag
Hi,

Question for anyone here that might be able give their opinion. My reservation number is, RN113530685 Dual Motor with FSD (reserved in June 2020). I know there is an insane number of orders and need to purchase a car in 2021. I’m willing to wait until late 2021 as long as I’m likely to get it in time.
I assume that with my reservation number my order I might not receive mine until 2022 sometime? Is it worth keeping my reservation with me needing to purchase a car in 2021?
Interim solution - buy a first generation used Mercedes ML, 1998 - 2005. You can pick one up in decent condition for $1,500 - $4,000. Pretty dang reliable. You can then sell it for about what you paid for it in a couple of years.
 

Jhodgesatmb

Well-known member
First Name
Jack
Joined
Dec 1, 2019
Messages
896
Reaction score
926
Location
San Francisco Bay area
Vehicles
Lexus Rx450H Tesla Model 3
Occupation
Researcher
Country flag
Interim solution - buy a first generation used Mercedes ML, 1998 - 2005. You can pick one up in decent condition for $1,500 - $4,000. Pretty dang reliable. You can then sell it for about what you paid for it in a couple of years.
Really? I wouldn't put a dime into an ICE car right now, especially with many countries and states talking about outlawing the sale of new ICE cars in the next 10-15 years and many municipalities outlawing them in major cities. I am dumping my hybrid onto the used market as soon as my CT is available or sooner if need be. Maybe I am just paranoid.
 

Cyber_Dav

Well-known member
First Name
David
Joined
Nov 21, 2019
Messages
303
Reaction score
374
Location
So Calif
Vehicles
Toyota Siennas (2)
Country flag
Maybe I am just paranoid.
Not paranoid, but definitely stressing about a non-issue.

When new car sales are (a goal, not a law) no longer for sale in California, there will still be a strong used ICE car market for another 10 or 15 years. The discussion was about a two year time frame... worrying now about 30 years from now is premature.
 

Advertisement





 


Advertisement
Top