TyPope
Well-known member
- First Name
- Ty
- Joined
- Mar 31, 2020
- Messages
- 583
- Reaction score
- 609
- Location
- Papillion, NE
- Vehicles
- 2013 Ford F350 Platinum, 2010 Toyota Prius, 2021 Tesla Cybertruck (reserved)
- Occupation
- Nuclear Operations Analyst
I agree with this if they work two shifts and do maintenance during the off 8 hr periods.I think the ramp up will be much faster with the CT. NO painting, NO stamping, Plug in wiring harness, far more experience in streamlining factory layout. They will ramp up to 10,000 units per week within 6 months and be able to produce over 300,000 units in first 52 weeks.
(former industrial engineer who worked for GM Shreveport Truck Assembly Plant)