Bigsur345
Member
- First Name
- MJ
- Joined
- Dec 7, 2019
- Messages
- 22
- Reaction score
- 24
- Location
- DFW, Texas
- Vehicles
- 2017 Honda, '72 Ford Ranchero, 2017 Moar Rapt II E-Bike
- Occupation
- Civil Engineer

With those scrapers there, they could be fast tracking with a grading permit only. Even to get to this point, this thing has been going through the engineering, environmental, plan check and permitting for numerous months .... impressive, they've got some hot shot PM's working for them.Wasting no time. A local area concrete truck driver said his company is expected to start deliveries in October.
![]()