Good question I've been wondering the same. Did you see this helpful video posted over the weekend which discusses this exact question due to Covid -- Analysis: Will Tesla Have to Delay Cybertruck Production / Launch?I’m wondering now how long we will have to wait for our Cyber Trucks, that we have deposited $$ on, since COVID - 19 has shut down production ! Another year past the original 2022/23? Might be looking at 2024/25?? Well may help me save more !!
Wow! Thank you for the information. I hope you’re right. Any progress is good progress.I think Tesla has chosen a location already and had city leadership sign a non disclosure agreement until Tesla makes the announcement.
Lotsa video of the Tulsa location construction: https://www.cybertruckownersclub.co...tory-site-construction-is-well-underway.1360/Tulsa seems likely. Construction was underway last I heard.
You seem to have responded to a thread from April. Tesla purchased land outside Austin, TX and began work there late in July. There are drone flyovers almost every day on YouTube.Tulsa seems likely. Construction was underway last I heard.
Silly me, new to the forum and still finding my way around.You seem to have responded to a thread from April. Tesla purchased land outside Austin, TX and began work there late in July. There are drone flyovers almost every day on YouTube.
Silly me, new to the forum and still finding my way around.
After watching Battery Day, Elon’s new battery cell being about 5 times more capacity and over 50 percent reduction in cost and space saving, I look forward to watching Sandy Munro’s next video on calculating the future pack size as it points to a lot less weight and the number of cells required to make a battery pack. Hopefully that means a tremendous weight reduction for the CT which will increase load capacity, range plus acceleration and possibly the price!