- #1
Time flies. Isn’t over 12% of the ramp-up time already elapsed? And they are shopping sites and thinking logistics? How long does it take to find a site, close, develop the site, design a building, get approval for the building, build the building, design the production, design the truck, design any new battery tech required, hire the workers, train the workers, and build the trucks? 21 months?